Small projects in India continue to be the main CER recipients. Total CERs issued for October aggregate to just $5.4 million. This month has also seen a decline in the overall number of projects submitted for prior consideration to the CDM.
Global View
The growth of the CDM pipeline in October was about average with 96 new projects. The amount of CERs issued is now 341 Million CERs, only 7.5 Million CERs were added in October.
The UNEP Risoe CDM/JI Pipeline Analysis have decreased projection of CERs to be available by the end of 2012 from 1212 MCERs to 1168 MCERs. The amount of CERs issued is now 341 Million CERs, only 7.5 Million CERs were added in October.
Leading indicator 1: Projects requesting prior consideration in India
27 projects from India in October requestes for prior consideration which was lower than the YTD monthly average of 51. The global projects submitted for prior consideration also has declined in this month to just 80. So Indian projects continue to be about 34% of the global pool. Most of the projects continue to be small in nature with 5 bundled projects.


The table below has additional details on the projects submitted from India.
Leading indicator 2: Projects requesting registration
10 projects from India requested registration which forms 15% of the global number.
| 1 |
20 MW Biomass Power Project in Tamilnadu |
| 2 |
Hydro Electric Power Project of Celerity Power Pvt. Ltd |
| 3 |
5.5 MW Bundled Wind Power Project by WMI Cranes Ltd. |
| 4 |
24 MW Bhilangana - III Hydro Power Project |
| 5 |
3.00 MW bundled Wind Power Project by Shree Jai Ambe Associates at Brahmanvel, Dist. Dhule (Maharashtra), India |
| 6 |
Dagachhu Hydropower Project, Bhutan |
| 7 |
Biomass based Power Plant in Polakpalli Village, Gulbarga District, Karnataka |
| 8 |
Avoidance of HFC-134a emissions in rigid Poly Urethane Foam (PUF) manufacturing by Acme TelePower Limited (ATPL) |
| 9 |
12.5 MW Small Scale Grid Connected Wind Electricity Generation Project by KRBL Ltd., District Dhule, Maharashtra, India |
| 10 |
N2O abatement in MP Nitric Acid plants at Rashtriya Chemicals & Fertilizers Limited, India |
Projects registered:
A total of 34 CDM projects were registered last quarter with a potential of generating 2.1 million CERs annually. Of these 9 projects (26%) came from India with a potential of generating 319,909 CERs (15% of the amount issued globally).
Count of projects registered in October:

CERs expected from the projects registered in October:

Projects registered from India in October
| Reference |
Project |
Registered |
Reductions |
| 2807 |
10 MW Bhavani Barrage-2 Small Hydroelectric Project for a Grid connected system, Tamil Nadu, India |
30-Oct-09 |
14140 |
| 2699 |
D.light Rural Lighting Project |
30-Oct-09 |
30052 |
| 2768 |
Flare Gas Recovery and Utilization of Recovered Flare Gas for process furnace and other heating applications |
30-Oct-09 |
27834 |
| 2729 |
5 MW Chirchind Grid-Connected SHP in Himachal Pradesh, India |
26-Oct-09 |
16861 |
| 2795 |
Avoidance of GHG emissions in rigid Poly Urethane Foam (PUF) manufacturing by LIL |
18-Oct-09 |
21482 |
| 2709 |
Chhattisgarh Lighting Improvement Project (CLIP) in Rajnandgaon Circle, Chhattisgarh , India |
12-Oct-09 |
24927 |
| 2605 |
100 MW Wind Power Project by RS India Wind Energy Pvt. Ltd. at Matrewadi & Varekrwadi, Satara district in Maharashtra |
11-Oct-09 |
177980 |
| 2706 |
KL Rathi Steels 1.5 MW Wind Power Project at Kutch District, Gujarat |
5-Oct-09 |
2710 |
| 2434 |
Methane recovery from wastewater generated at Paper manufacturing unit of Sree Sakthi Paper Mills Ltd., Kerala |
1-Oct-09 |
3923 |
CER Issuance
A total of 284,974 CERs (approx value of 3.7m Euros or US$ 5.4m based on the spot prices) were issued over the last month in India.The average CER per project from India for this month was 25K CERs per project continue to be lower as compared to the global average 98K CERs per project for October.
CER Issuance Oct:

Additional Resources
Data Monitor
JAS Quarterly review: India CDM activity depressed, some innovative projects in pipeline
Table: Projects requesting prior consideration in October 2009
| |
Project title |
Entity Name |
| 1 |
Avoidance of coal by burning hydrogen for thermal application in chemical plant in Osmanabad district of Maharashtra, India |
Balaji Amines Ltd. |
| 2 |
50 MW Solar Thermal Power Project at Jaisalmer |
ACME Tele Power Limited (ATPL), Gurgaon, India |
| 3 |
Methane capture and utilization for energy generation at Pappireddiipatty |
Varalakshmi starch industries private limited |
| 4 |
2 x 600 MW Power Project by Coastal Energen Private Limited |
Coastal Energen Private Limited |
| 5 |
Energy efficient polyester production process using post-use PET waste |
Polygenta Technologies Limited |
| 6 |
Bundled wind power project by Gangamai Industries and Construction Limited |
M/s Gangamai Industries & Construction Ltd. |
| 7 |
Small scale bundle with energy project in India2 |
M/s Highway Infrastructure Private Limited |
| 8 |
Wind power project by Relaxo Fottwears Limited in Rajasthan |
Relaxo Footwears Limited |
| 9 |
Small scale bundle wind energy project in India |
M/s Eagle Seeds & Biotech Ltd |
| 10 |
Fossil fuel replacement by renewable biomass for thermal energy application in spray drier |
H & R Johnson (India) Ltd |
| 11 |
Dam spillage based small hydro power project |
Mohite & Mohite Pvt. Ltd. |
| 12 |
Natural gas based Energy Generation Project though Centralization of Utilities at Honda Siel Cars India (HSCI), by QEPL |
Quippo Energy Private Limited |
| 13 |
Energy Efficient Green Building at New Delhi by ONGC Ltd. |
Oil and Natural gas Corporation Limited (ONGC) |
| 14 |
2 0.8 MW Wind Power CDM Project by Arex Industries Ltd., Gandhinagar-Gujarat, India |
Arex Industries Ltd. |
| 15 |
Shree Sidhbali WHRB CDM Project |
Shree Sidhbali Ispat Ltd. |
| 16 |
Fly ash bricks and block manufacturing by Magnum Concretes Pvt. Ltd |
MAGNUM Concretes Pvt. Ltd, |
| 17 |
2_0.8 MW Wind Power CDM Project by Texmo Industries, Mettupalayam Road, G N Mills Post, Coimbatore 641029, Tamil, Nadu, India |
Texmo Industries |
| 18 |
1.5MW Wind Power Project by Idupulapadu Cotton Mills Limited |
Idupulapadu Cotton Mills Limited |
| 19 |
Electrical Power generation from Renewable Source of Energy - Wind Turbine Generators (WTG) in India {Bundled Project}6 |
Quantum Equipment company Ltd. |
| 20 |
Bagasse based cogeneration project by Purna Sahakari Sakhar Karkhana Limited in Maharashtra, India |
Purna Sahakari Sakhar Karkhana Limited (PSSKL) |
| 21 |
Biomass residue fired boiler for steam and power requirements |
Kudos Chemie Ltd. |
| 22 |
Grid connected renewable electricity generation in Tamil Nadu, (M.K.M MOHAMED ILYAS - WEG capacity 0 600kWx1) - Bundle project |
M/s. M H Jewellers |
| 23 |
Wind power project in Tamilnadu, India – structured by AQUA sub Enggineering |
URS Productively |
| 24 |
Municipal Solid Waste (MSW) processing plant in Agra by Ultra Urban Infratech Limited |
Ultra Urban Infratech |
| 25 |
1.8 MW Windmill Power Project in Tamil Nadu |
Coimbatore Pioneer Fertilizers Ltd. |
| 26 |
Biomass based energy generation at Shambhu Textile Mills Pvt. Ltd. |
Shambhu Textile Mills Pvt. Ltd. |
| 27 |
Municipal Solid Waste (MSW) processing plant in Amritsar by AKC Developers Limiited |
AKC Developers Limited |